Video 2 · FTC TeleOp series
Meet the Motors: From Java Names to Real Hardware
Connect Java motor variables to the configured devices on the Robot Controller.
POWERING ON safety sequence
- Secure the robot and confirm it is disabled.
- Look around the work area.
- Call out “POWERING ON!”
- Give everyone time to step away.
- Visually confirm the area is clear.
- Press PLAY only when it is safe.